Tampines North Bus Interchange
![]() | The topic of this article may not meet Wikipedia's notability guideline for geographic features. (November 2022) |
Tampines North Bus Interchange 淡滨尼北巴士转换站 Pertukaran Bas Tampines North | |
---|---|
![]() Public Bus Interchange | |
General information | |
Location | 20A Tampines North Drive 2, Singapore 529511 |
Owned by | Land Transport Authority |
Operated by | SBS Transit Ltd (ComfortDelGro Corporation) |
Bus routes | 4 |
Bus stands | 4 Boarding, 2 Alighting |
Bus operators | SBS Transit Ltd |
Connections | CR6 Tampines North (U/C) |
Construction | |
Structure type | At-grade |
Accessible | Accessible alighting/boarding points Accessible public toilets Graduated kerb edges Tactile guidance system |
History | |
Opened | 27 November 2022 |
Key dates | |
27 November 2022 | Commenced operations |
Tampines North Bus Interchange is a bus interchange serving Tampines in Singapore. Operated by SBS Transit, the bus interchange is located along Tampines Street 62.[1]
The bus interchange opened on 27 November 2022 and features wheelchair-friendly facilities for the disabled.[2][3] The new interchange is designed by SDA Architects.[4]
History
[edit]The interchange was built at a cost of about S$12.8 million,[5] and was opened on 27 November 2022. The interchange provides bus connections to Tampines North estate. Bus Service 18 and 129 are the first bus routes to serve Tampines North Bus Interchange, which previously terminated at Tampines Concourse Bus Interchange prior to being amended to their current route.
Bus contracting model
[edit]Under the new Bus Contracting Model, Tampines North Bus Interchange is under the Tampines Bus Package, operated by SBS Transit. All three bus services serving this bus interchange are operated by SBS Transit.
List of routes
[edit]Operator | Package | Routes |
---|---|---|
SBS Transit | Tampines | 18, 129, 298, 299 |
Redevelopment
[edit]As part of LTA's Land Transport Masterplan 2040, the current bus interchange at Tampines North will serve as an interim bus interchange, before it is redeveloped as part of the Tampines North Integrated Transport Hub (ITH), providing rail connection with the future Tampines North MRT station.[6] The ITH will be part of a mixed-used development comprising a shopping mall and a condominium.[7]
In July 2023, the land parcel along Tampines Avenue 11 and 6 was awarded to Topaz Residential and Topaz Commercial, which will be responsible for the construction of the mixed-used development, including the ITH.[8] The development is scheduled to be completed in 2030, in tandem with the opening of Tampines North MRT station.
References
[edit]- ^ "LTA | Tampines North Bus Interchange to Open on 27 November 2022". www.lta.gov.sg. Archived from the original on 3 December 2022. Retrieved 3 January 2023.
- ^ "Tampines North Bus Interchange to Open on 27 November 2022". LTA. Archived from the original on 3 November 2022. Retrieved 3 November 2022.
- ^ "Tampines North bus interchange to open on Nov 27 with family-friendly and inclusive facilities". CNA. 31 October 2022. Archived from the original on 30 November 2022. Retrieved 3 November 2022.
- ^ "Tampines North Bus Interchange". SD Architects & Associates Pte. Ltd. Archived from the original on 3 November 2022. Retrieved 3 November 2022.
- ^ "Annual Report 1819.pdf" (PDF). Land Transport Authority. p. 34. Retrieved 17 May 2025.
Proposed Design and Construction of Bus Interchange and Associated Works at Tampines North
- ^ "LTA LTMP 2040 eReport.pdf" (PDF). Land Transport Authority. p. 22. Archived (PDF) from the original on 6 August 2021. Retrieved 27 April 2025.
- ^ "Parktown Residence™ @ Tampines". Retrieved 10 December 2024.
- ^ "Final Tender Results For Land Parcel at Tampines Avenue 11 for Mixed Use Development". Housing and Development Board. 11 July 2023. Retrieved 17 May 2025.
External links
[edit]