Nagareyama Line
![]() | You can help expand this article with text translated from the corresponding article in Japanese. (September 2024) Click [show] for important translation instructions.
|
Nagareyama Line 流山線 | |
---|---|
Ryūtetsu Nagareyama 2000 series EMU Aozora near Mabashi | |
Overview | |
Owner | Ryūtetsu |
Locale | Chiba Prefecture |
Termini | |
Stations | 6 |
Service | |
Type | Heavy rail |
Depot(s) | Nagareyama |
History | |
Opened | 1916 |
Technical | |
Line length | 5.7 km (3.54 mi) |
Track gauge | 1,067 mm (3 ft 6 in) |
Electrification | 1,500 V DC overhead catenary |
The Nagareyama Line (流山線, Nagareyama-sen) is a commuter rail line in Chiba Prefecture, Japan, operated by Ryutetsu (流鉄株式会社, Ryūtetsu kabushiki-kaisha) between Mabashi Station in Matsudo and Nagareyama Station in Nagareyama. The line and the operator company was called the Sōbu Nagareyama Line (総武流山線, Sōbu Nagareyama-sen) and Sōbu Nagareyama Electric Railway (総武流山電鉄, Sōbu Nagareyama Dentetsu) respectively until the renaming on August 1, 2008.[1] The present line name was the most popular short name of the line. It was also called Ryūden (流電).
This is the only line Ryūtetsu operates, making the company unique for being an independent railway operator with just a single 5.7 km line and no major subsidiary businesses (unlike Yamaman, or The Oriental Land Company and their Disney Resort Line). The short line functions as a link between the centre of the city of Nagareyama and the East Japan Railway Company (JR East) Jōban Line. However, after the opening of the Tsukuba Express on August 24, 2005, ridership fell sharply. Suica and PASMO contactless smart cards cannot be used, and Ryūtetsu reportedly has no plans to introduce the system on the line.
Basic data
[edit]- Double-tracking: None
- Railway signalling: Automatic Train Stop
- Passing loop: Kogane-Jōshi Station
Rolling Stock
[edit]Current
[edit]- 5000 series (former Seibu New 101 series) 2-car EMU x five trainsets
Future
[edit]On July 9, 2025, Ryutetsu announced that they had purchased four 211-6000 series 2-car trainsets GG5/GG6/GG8/GG9 (8 cars) from JR Central. The trains will be refurbished before entering service to replace the current 5000 series trains.[2][3][4]
Stations
[edit]All stations are in Chiba Prefecture.
No. | Station | Japanese | Distance | Transfers | Location | |
---|---|---|---|---|---|---|
Between stations |
Total | |||||
RN1 | Mabashi | 馬橋 | - | 0.0 km (0 mi) | Jōban Line | Matsudo |
RN2 | Kōya | 幸谷 | 1.7 km (1.1 mi) | 1.7 km (1.1 mi) | Jōban Line, Musashino Line (Shin-Matsudo, unofficial) | |
RN3 | Kogane-Jōshi | 小金城趾 | 1.1 km (0.68 mi) | 2.8 km (1.7 mi) | ||
RN4 | Hiregasaki | 鰭ヶ崎 | 0.8 km (0.50 mi) | 3.6 km (2.2 mi) | Nagareyama | |
RN5 | Heiwadai | 平和台 | 1.5 km (0.93 mi) | 5.1 km (3.2 mi) | ||
RN6 | Nagareyama | 流山 | 0.6 km (0.37 mi) | 5.7 km (3.5 mi) |
History
[edit]The company was incorporated on November 7, 1913 as Nagareyama Light Railway (流山軽便鉄道, Nagareyama Keiben Tetsudō) and opened a 762 mm (2 ft 6 in) gauge railway on March 14, 1916. The company renamed Nagareyama Railway (流山鉄道, Nagareyama Tetsudō) in November 1922 and rebuilt the railway track to 1,067 mm (3 ft 6 in) gauge in 1924.[1]
The company name was again changed to Nagareyama Electric Railway (Nagareyama Denki Tetsudō) in 1949, to Nagareyama Electric Railway (Nagareyama Dentetsu) in 1967, to Sōbu Nagareyama Electric Railway in 1971 and to Ryūtetsu in 2008.[1]
References
[edit]This article incorporates material from the corresponding article in the Japanese Wikipedia.
- ^ a b c 総武流山電鉄 社名と線名を変更 (in Japanese). 2008-06-27. Archived from the original on 2008-06-30. Retrieved 2008-10-16.
- ^ "お知らせ | 流鉄". ryutetsu.jp (in Japanese). Retrieved 2025-09-02.
- ^ "211系ホームページに掲載するリリース.pdf" (PDF). ryutetsu.jp (in Japanese). Retrieved 2025-09-02.
- ^ "上越線・吾妻線で211系の営業運転開始|鉄道ニュース|2016年8月24日掲載|鉄道ファン・railf.jp". 鉄道ファン・railf.jp (in Japanese). Retrieved 2025-09-02.
External links
[edit]- Official website (in Japanese)