| 40 Charter Street | |
|---|---|
40 Charter Street in August 2025 | |
![]() Interactive map of 40 Charter Street | |
| Alternative names | Wood Wharf E3/E4 |
| General information | |
| Status | Topped out |
| Type | Residential |
| Location | London, E14 England,
|
| Coordinates | 51°30′07″N 0°00′44″W / 51.5019°N 0.0123°W |
| Construction started | 2022 |
| Completed | 2027 |
| Owner | Canary Wharf Group |
| Height | 178.6 m (586 ft) |
| Technical details | |
| Floor count | 53 |
| Floor area | 590,000 ft2 (55,000 m2) |
| Design and construction | |
| Architecture firm | Kohn Pedersen Fox Associates |
40 Charter Street is a residential skyscraper under construction within the Wood Wharf development on the Isle of Dogs in London, England.
Part of Phase Three of the larger Wood Wharf masterplan,[1] the building is being developed by the Canary Wharf Group. It was designed by the architecture firm KPF and rises to 178.6 metres (586 ft).[2]
The building was a finalist for the Net Zero Award at the Building Awards 2024, and a finalist at the New London Awards 2023.[3] It has won the Best Digital Transformation Award at the 2025 Building Innovation Awards.[4]
History
[edit]Planning
[edit]An original planning application was submitted in 2014,[5] with a tower height of 192 metres (630 ft).[6] An updated application was approved in February 2022.[7]
Construction
[edit]Construction began on the tower in 2022, with Canary Wharf Contractors overseeing the construction.[2] 40 Charter Street has an estimated completion date of February 2027.[8]
Design
[edit]The building, designed by KPF, is planned to be a 53-storey tower. It will contain 552 built-to-rent apartments.[9] The architectural design is noted for its undulating facade, which breaks from the more orthogonal grid of the surrounding neighbourhood and provides a dynamic interplay of horizontal and vertical elements. The apartments are designed to prioritise internal amenity space and feature floor-to-ceiling windows and Juliette balconies, offering views of the South Dock and surrounding area.[3]
It is planned to include over 1,500 square metres (16,000 sq ft) of shared amenity space in its podium, including a gym, business centre, and other multi-functional rooms.[3]
Gallery
[edit]-
40 Charter Street under construction in October 2023
-
40 Charter Street under construction in May 2024
-
40 Charter Street under construction in May 2025
See also
[edit]References
[edit]- ^ "Phase Three will complete our residential offering on Wood Wharf". Canary Wharf Group. Retrieved 8 September 2025.
- ^ a b "40 Charter Street - The Skyscraper Center". Skyscraper Center. CTBUH. Retrieved 8 September 2025.
- ^ a b c "40 Charter Street". KPF. Retrieved 8 September 2025.
- ^ 40 Charter Street Team Wins Building Innovation Award. 10 March 2025KPF. Retrieved 7 October 2025.
- ^ "Application Details" (PDF). Tower Hamlets Council. 21 July 2014. Retrieved 8 September 2025.
- ^ "Wood Wharf E3/E4". Skyscraper Center. CTBUH. Archived from the original on 24 February 2017. Retrieved 8 September 2025.
- ^ Ing, Will (23 February 2022). "GRID architects and Kohn Pedersen Fox (KPF) have been given full planning permission for three towers on the Isle of Dogs, east London". Architects' Journal. Retrieved 8 September 2025.
- ^ "40 Charter Street (Building E3E4) - Wood Wharf". New London Architecture. 13 January 2025. Retrieved 8 September 2025.
- ^ "40 Charter Street". 1newhomes. Retrieved 8 September 2025.
